LADEE Trajectory Update 10-22-13: Post LOI-3 Commissioning Orbit
Sorry for the delay in updating, Astrogator_Mike had to make the long drive home after LOI-3 and get configured back in his home base. In the mean time, Lunar Orbit Insertion Burn 3 (LOI-3) was completed successfully (within 0.6% of target) on Oct. 13, 2013. LADEE’s post LOI-3 orbit had an aposelene altitude of 250 km, and a periselene altitude of 235 km. You can see below that this has evolved over time to 220 km x 260 km.
LADEE will now stay parked (i.e. no maneuvers) for roughly a month, while the spacecraft does alternating Lunar Laser Communication Demonstration (LLCD) tests, and calibration tests of the other science instruments.
In fact, the LLCD has been doing really well, breaking records and having all sorts of fun: NASA Is Now Communicating With the LADEE Spacecraft Via Laser
LADEE’s current view looks like this:
Which looks like this from above the orbit:
And from the Earth looks like this:
Note that you can zoom in on any of these pictures by clicking on them.